The on-site replacement facility for Blackwell Regional Hospital required intricate phasing coordination between the architectural design team, construction manager and engineering subdisciplines.

The on-site replacement facility for Blackwell Regional Hospital required intricate phasing coordination between the architectural design team, construction manager and engineering subdisciplines. The Emergency and Physical Therapy Department will remain operational throughout the duration of construction, despite the demolition of a 4-story tower building adjacent to the ED.  

New construction includes 36,500 SF, a 6-bed Acute Care Unit, a Laboratory, Rural Health Clinic, Specialty Clinic, Entry, Admittance/Waiting Area, Support Services, and Radiology. Project includes heavy infrastructure upgrades that were carefully coordinated to maintain operations.  

Construction cost: $12,511,400. 

Design Completion: 2020/04/22
Construction Completion:  

Phase I (ED, cafeteria, facilities space, X-ray, some patient rooms, a few clinic rooms): November 2021 

Phase II: April/May 2022 (as of 11/2021) 

Managed by Stillwater Medical 

Owner: Blackwell Hospital Trust Authority 

Financing: 1% dedicated sales tax, approximately $800,000 annual appropriation from the Blackwell Public Trust